PropX8
Turner House, Bandra West

Commercial · Office

Turner House

by Raiaskaran · Turner Road, Bandra (W), Mumbai

Key facts

Unit types
Office
Carpet area
424 – 4,811 sq ft carpet (MahaRERA)
Price
Price on request
MahaRERA
P51800047873
Completion (MahaRERA)
2028-07-31
Building
G+17 floors

Unit sizes on MahaRERA

Carpet area (the usable floor area) as registered on MahaRERA. Builders often quote a larger chargeable area: compare prices per carpet sq ft.

Unit typeCarpet areaUnits
Office space · TURNER HOUSE662 sq ft (61.5 sq m)10
Office space · TURNER HOUSE993 sq ft (92.25 sq m)10
Office space · TURNER HOUSE678 sq ft (63 sq m)7
Office space · TURNER HOUSE487 sq ft (45.27 sq m)7
Office space · TURNER HOUSE3,865 sq ft (359.06 sq m)1
Office space · TURNER HOUSE1,556 sq ft (144.54 sq m)2
Office space · TURNER HOUSE1,069 sq ft (99.34 sq m)7
Office space · TURNER HOUSE424 sq ft (39.39 sq m)10
Office space · TURNER HOUSE1,475 sq ft (137.02 sq m)2
Office space · TURNER HOUSE1,478 sq ft (137.31 sq m)2
Office space · TURNER HOUSE1,399 sq ft (130 sq m)1
Office space · TURNER HOUSE3,555 sq ft (330.26 sq m)1
Office space · TURNER HOUSE1,152 sq ft (107 sq m)1
Office space · TURNER HOUSE904 sq ft (84 sq m)1
Office space · TURNER HOUSE4,811 sq ft (447 sq m)3

Verified by PropX8 on MahaRERA

MahaRERA Record: Delivery, Litigation & Complaints

Has the builder kept the completion date promised to the regulator? Is there litigation or are there complaints? Checked on the MahaRERA website, Maharashtra's real estate regulator.

MAHARERA CHECKED · PROPX8 ·21 Nov 26

Checked on MahaRERA · 21 Nov 2026

Mar 2028
Promised date
Jul 2028
Current date
None
Extensions

✓ The completion date has not been moved by the builder. The date moved 4 months only because of MahaRERA's automatic 4-month extension of 2026, given to all eligible projects.

RERA number
P51800047873
Registered
Dec 2022
MahaRERA status
Active

Litigation & complaints

Yes
Litigation against project
0
Complaints on MahaRERA
0
Still pending

BOMBAY HIGH COURT, 1572, 2007

A complaint is not by itself a finding against the builder. Read each order on MahaRERA.

Source: MahaRERA public project records. Dates can change after our check; confirm on MahaRERA before booking.

Location & Connectivity

  • Metro

    Bandra Colony

    4.3 km

    7 min drive*

  • Railway station

    Bandra

    0.9 km

    11 min walk

  • Airport

    Mumbai Airport (Terminal 2)

    9.5 km

    12 min drive*

  • Highway

    Western Express Highway

    1.6 km

    19 min walk

  • Business district

    Bandra Kurla Complex

    5.8 km

    7 min drive*

  • School

    Bandra Petit School

    0.6 km

    7 min walk

  • Hospital

    K B Bhabha Municipal General Hospital

    0.9 km

    11 min walk

Road distances from the project's map location. *Drive times assume no traffic; peak-hour travel in Mumbai usually takes considerably longer. Walk times at 5 km/h. Data: © OpenStreetMap contributors, routing by OSRM.

Highlights

  • Heritage-inspired architecture by Ar. Hafeez Contractor
  • LEED Platinum certified (core & shell); ISO certified
  • Limited suites per floor with arrival lounges and high-speed elevators
  • 24-hr attended lobbies
  • Fine art viewing gallery with DAG partnership

Amenities

Fine Art Viewing Gallery
Gym
Cafe
Screening Room
Meeting lounge
Turner House photo 6