Kalpataru Radiance
Goregaon West, Mumbai
By Kalpataru
Checked on MahaRERA · 6 Nov 2026Completion date moved 2 years 6 months (from Jun 2022 to Dec 2023)Litigation listed33 complaints (3 pending)See MahaRERA record₹ 5.50 Cr onwards
- Configuration
- 2, 3 & 4 BHK
- Carpet area
- 906–2,164 sq.ft. carpet
- Possession
- Dec 2023
- Status
- Ready to Move
- OC
- Not shown on MahaRERA (checked 6 Nov 2026)
- RERA
- Registered · P51800000482
MahaRERA project registration P51800000482, available at maharera.maharashtra.gov.in.
PropX8 MahaRERA agent registration A0311825022223.
Prices and availability can change. Get the latest developer inventory.
Project Snapshot
- Developer
- Kalpataru
- Location
- Goregaon West, Mumbai
- Configuration
- 2, 3 & 4 BHK
- Carpet area
- 906–2,164 sq.ft.
- Price
- ₹ 5.50 Cr onwards
- Possession
- Dec 2023
- Status
- Ready to Move
- Project area
- 4.2 acres
- Structure
- 2B+G+3P+31
- RERA
- P51800000482
About Kalpataru Radiance
Kalpataru Radiance is a residential project by Kalpataru in Goregaon West, Mumbai, near Swami Vivekananda Rd, Motilal Nagar I, Goregaon West. It rises 2B+G+3P+31 on 4.2 acres and offers 2, 3 & 4 BHK apartments. Possession was listed for Dec 2023, and the project is now shown as ready to move. It is registered with MahaRERA under P51800000482.
Starting prices are ₹ 5.50 Cr for a 3 BHK (1,318 sq.ft. carpet) and ₹ 12.50 Cr for a 4 BHK (2,164 sq.ft. carpet). The 2 BHK is sold out. That works out to roughly ₹49.7K/sq.ft. of carpet area, about 47% above the Goregaon West median of ₹33.8K/sq.ft. across 59 projects we track.
For commuting, Goregaon (West) Metro station is 1.8 km by road, Ram Mandir railway station is 1.7 km (about 20 minutes on foot) and the Western Express Highway is 4.7 km by road. Nearby, Vibgyor (school) is 1.1 km (about 14 minutes on foot) and Siddarth Municipal Hospital is 0.8 km (about 9 minutes on foot). By road, the airport is 11 km and Bandra Kurla Complex 16 km away.
On-site amenities include swimming pool, clubhouse, kids play area, multi purpose court, kids pool and squash court.
Key Highlights
- Four towers on 4.2 acres.
- Offers 2, 3, and 4 BHK units.
- Carpet areas from 906 to 2164 sqft.
- Price range ₹ 5.50 Cr - ₹ 12.50 Cr.
- Includes swimming pool, clubhouse, gymnasium.
- MahaRERA possession scheduled for October 2023.
Construction Progress
New Launch
Under Const.
Near Poss.
Ready to Move
Floor Plans & Pricing
Select a configuration to update the True Cost calculator below.
True cost for the 3 BHK at ₹ 5.50 Cr
True Cost & ROI Engine
Includes all Govt. Taxes & Duty
Est. EMI (20 Yrs)
₹ 3.82 L /mo
Loan Req.
₹ 4.40 Cr
5-Year Wealth Projection
Verified by PropX8 on MahaRERA
MahaRERA Record: Delivery, Litigation & Complaints
Has the builder kept the completion date promised to the regulator? Is there litigation or are there complaints? Checked on the MahaRERA website, Maharashtra's real estate regulator.
Checked on MahaRERA · 5 Nov 2026
The completion date has moved 1 year 6 months: from Jun 2022 (original) to Dec 2023 (revised) on MahaRERA. MahaRERA shows the revised date without the reasons.
- RERA number
- P51800000482
- Registered
- Jul 2017
- MahaRERA status
- Completed
Litigation & complaints
Bombay High Court, Suit Lodging No 176, 2018
| Complaint no. | Filed | Status on MahaRERA |
|---|---|---|
| CC006000000429257 | Feb 2024 | Order Approved |
| CC006000000110892 | Dec 2019 | Order Approved |
| CC006000000171610 | Dec 2019 | Order Approved |
| CC006000000192312 | Jan 2020 | Order Approved |
| CC006000000192945 | Mar 2020 | Order Approved |
| CC006000000193698 | Aug 2020 | Order Approved |
| CC006000000194344 | Oct 2020 | Roznama Approved |
| CC006000000195075 | Nov 2020 | Order Approved |
| CC006000000480041 | Apr 2024 | Order Approved |
| CC006000000198312 | Sep 2021 | Order Approved |
| CC006000000198846 | Oct 2021 | Order Approved |
| CC006000000209471 | Mar 2022 | Order Approved |
| CC006000000209676 | Jan 2022 | Order Approved |
| CC006000000209730 | Feb 2022 | Order Approved |
| CC006000000292573 | Sep 2022 | Order Approved |
| CC006000000302886 | Sep 2022 | Order Approved |
| CC006000000210509 | Mar 2022 | Order Approved |
| CC006000000364563 | Jun 2023 | Order Approved |
| CC006000000375377 | Apr 2023 | Order Approved |
| CC006000000395445 | May 2023 | Order Approved |
| CC006000000408557 | Jan 2024 | Order Approved |
| CC006000000428746 | Jan 2024 | Order Approved |
| CC006000000469755 | Mar 2024 | Order Approved |
| CC006000000480122 | Apr 2024 | Roznama Approved |
| CC006000000480226 | Apr 2024 | Order Approved |
| CC006000000480224 | Apr 2024 | Order Approved |
| CC12400226 | Sep 2024 | Roznama Approved |
| CC12502356 | Jul 2025 | Order Approved |
| CC12503333 | Sep 2025 | Order Approved |
| CC12503567 | Oct 2025 | Order Approved |
| CC12503826 | Nov 2025 | Order Approved |
| CC12504024 | Nov 2025 | Order Approved |
| CC12504290 | Dec 2025 | Order Approved |
A complaint is not by itself a finding against the builder. Read each order on MahaRERA.
Checked on MahaRERA · 5 Nov 2026
The completion date has moved 1 year 6 months: from Jun 2022 (original) to Dec 2023 (revised) on MahaRERA. MahaRERA shows the revised date without the reasons.
- RERA number
- P51800000579
- Registered
- Jul 2017
- MahaRERA status
- Completed
Litigation & complaints
Court: Bombay High Court, Case Number: Suit Lodging No 176, Case Year: 2018
| Complaint no. | Filed | Status on MahaRERA |
|---|---|---|
| CC006000000000993 | Oct 2017 | Order Approved |
| CC006000000044145 | Apr 2018 | Order Approved |
| CC006000000194043 | Sep 2020 | Order Approved |
| CC006000000194077 | Sep 2020 | Order Approved |
| CC006000000171744 | Dec 2019 | Order Approved |
| CC006000000192216 | Jan 2020 | Order Approved |
| CC006000000192221 | Jan 2020 | Order Approved |
| CC006000000192305 | Jan 2020 | Order Approved |
| CC006000000192306 | Jan 2020 | Order Approved |
| CC006000000192307 | Jan 2020 | Order Approved |
| CC006000000192308 | Jan 2020 | Order Approved |
| CC006000000193699 | Aug 2020 | Order Approved |
| CC006000000193971 | Sep 2020 | Order Approved |
| CC006000000195374 | Dec 2020 | Order Approved |
| CC006000000195412 | Dec 2020 | Order Approved |
| CC006000000195424 | Jan 2021 | Order Approved |
| CC006000000196415 | Mar 2021 | Order Approved |
| CC006000000196826 | May 2021 | Order Approved |
| CC006000000196869 | Jun 2021 | Order Approved |
| CC006000000197455 | Jul 2021 | Order Approved |
| CC006000000197928 | Aug 2021 | Order Approved |
| CC006000000198192 | Apr 2022 | Order Approved |
| CC006000000198394 | Oct 2021 | Order Approved |
| CC006000000209588 | Jan 2022 | Order Approved |
| CC006000000292303 | Aug 2022 | Order Approved |
| CC006000000197569 | Jul 2021 | Order Approved |
| CC006000000303517 | Dec 2022 | Order Approved |
| CC006000000480046 | Apr 2024 | Order Approved |
| CC006000000479895 | Apr 2024 | Order Approved |
| CC006000000480217 | Apr 2024 | Order Approved |
| CC006000000480236 | Apr 2024 | Order Approved |
| CC006000000480244 | Apr 2024 | Order Approved |
| CC006000000480246 | Apr 2024 | Order Approved |
| CC006000000480247 | Apr 2024 | Order Approved |
| CC006000000480248 | Apr 2024 | Order Approved |
| CC006000000500477 | May 2024 | Order Approved |
| CC12400582 | Oct 2024 | Order Approved |
| CC12400583 | Oct 2024 | Order Approved |
| CC12502727 | Aug 2025 | Order Approved |
| CC12503335 | Sep 2025 | Order Approved |
A complaint is not by itself a finding against the builder. Read each order on MahaRERA.
Checked on MahaRERA · 6 Nov 2026
The completion date has moved 1 year 6 months: from Jun 2022 (original) to Dec 2023 (revised) on MahaRERA. MahaRERA shows the revised date without the reasons.
- RERA number
- P51800000591
- Registered
- Jul 2017
- MahaRERA status
- Completed
Litigation & complaints
Bombay High Court, Suit Lodging No 176, Year 2018
| Complaint no. | Filed | Status on MahaRERA |
|---|---|---|
| CC006000000023939 | Apr 2018 | Order Approved |
| CC006000000141045 | Sep 2019 | Order Approved |
| CC006000000194969 | Nov 2020 | Order Approved |
| CC006000000195230 | Dec 2020 | Roznama Approved |
| CC006000000023575 | Mar 2018 | Order Approved |
| CC006000000171743 | Dec 2019 | Order Approved |
| CC006000000193053 | Mar 2020 | Order Approved |
| CC006000000195089 | Dec 2020 | Order Approved |
| CC006000000195098 | Dec 2020 | Order Approved |
| CC006000000197295 | Jun 2021 | Order Approved |
| CC006000000197584 | Jul 2021 | Order Approved |
| CC006000000197604 | Jul 2021 | Order Approved |
| CC006000000198449 | Sep 2021 | Order Approved |
| CC006000000210025 | Feb 2022 | Order Approved |
| CC006000000292380 | Aug 2022 | Order Approved |
| CC006000000375093 | Apr 2023 | Order Approved |
| CC006000000397025 | Aug 2023 | Order Approved |
| CC006000000397133 | Aug 2023 | Order Approved |
| CC006000000397134 | Aug 2023 | Order Approved |
| CC006000000408190 | Nov 2023 | Order Approved |
| CC12502408 | Jul 2025 | Order Approved |
| CC12502409 | Jul 2025 | Order Approved |
A complaint is not by itself a finding against the builder. Read each order on MahaRERA.
Checked on MahaRERA · 6 Nov 2026
The completion date has moved 2 years 6 months: from Jun 2022 (original) to Dec 2024 (revised) on MahaRERA. MahaRERA shows the revised date without the reasons.
- RERA number
- P51800000810
- Registered
- Jul 2017
- MahaRERA status
- Completed
Litigation & complaints
Bombay High Court, Suit Lodging No 176, Year 2018
| Complaint no. | Filed | Status on MahaRERA |
|---|---|---|
| CC006000000000702 | Sep 2017 | Order Approved |
| CC006000000193027 | Mar 2020 | Order Approved |
| CC006000000194363 | Oct 2020 | Order Approved |
| CC006000000480018 | Apr 2024 | Order Approved |
| CC006000000480037 | Apr 2024 | Order Approved |
| CC006000000196695 | Apr 2021 | Roznama Approved |
| CC006000000196899 | May 2021 | Order Approved |
| CC006000000197494 | Jul 2021 | Order Approved |
| CC006000000197497 | Jul 2021 | Order Approved |
| CC006000000198191 | Sep 2021 | Order Approved |
| CC006000000210370 | Apr 2022 | Order Approved |
| CC006000000221085 | May 2022 | Order Approved |
| CC006000000221129 | May 2022 | Order Approved |
| CC006000000251326 | Jun 2022 | Order Approved |
| CC006000000292807 | Sep 2022 | Order Approved |
| CC006000000303114 | Nov 2022 | Order Approved |
| CC006000000303531 | Dec 2022 | Order Approved |
| CC006000000303578 | Dec 2022 | Order Approved |
| CC006000000303700 | Dec 2022 | Order Approved |
| CC006000000397049 | Aug 2023 | Order Approved |
| CC006000000428823 | Jan 2024 | Order Approved |
| CC006000000480137 | Apr 2024 | Order Approved |
| CC12502439 | Jul 2025 | Order Approved |
| CC12502440 | Jul 2025 | Order Approved |
| CC12502498 | Jul 2025 | Order Approved |
| CC12502701 | Aug 2025 | Roznama Approved |
| CC12503337 | Sep 2025 | Order Approved |
| CC12504333 | Dec 2025 | Order Approved |
A complaint is not by itself a finding against the builder. Read each order on MahaRERA.
Checked on MahaRERA · 6 Nov 2026
The completion date has moved 1 year 6 months: from Jun 2022 (original) to Dec 2023 (revised) on MahaRERA. MahaRERA shows the revised date without the reasons.
- RERA number
- P51800013245
- Registered
- Sep 2017
- MahaRERA status
- Completed
Litigation & complaints
Bombay High Court, Suit Lodging No 176 (2018)
A complaint is not by itself a finding against the builder. Read each order on MahaRERA.
Kalpataru: delivery record
Of 6 Kalpataru projects PropX8 has checked on MahaRERA, 4 have kept the original completion date and 2 have moved it (extensions MahaRERA gave all projects not counted). Complaints on MahaRERA across these projects: 175. Projects with litigation listed: 4.
All Kalpataru projectsSource: MahaRERA public project records. Dates can change after our check; confirm on MahaRERA before booking.
Price Intelligence
Kalpataru Radiance Price Analysis
This project
₹49.7K/sq.ft.
median across 2 configurations
Goregaon West median
₹33.8K/sq.ft.
across 59 other projects we list
Compared with Goregaon West
47% above
the locality median price per sq.ft.
Price per sq.ft. by configuration
Goregaon West median3 BHK
1,318 sq.ft. · ₹ 5.50 Cr
₹41.7K/sq.ft.
4 BHK
2,164 sq.ft. · ₹ 12.50 Cr
₹57.8K/sq.ft.
Green bars are at or below the Goregaon West median.
Kalpataru Radiance by Kalpataru in Goregaon West offers 2, 3 & 4 BHK homes. Listed prices range from ₹ 5.50 Cr for a 3 BHK (1318 sq ft carpet) to ₹ 12.50 Cr for a 4 BHK (2164 sq ft). The 3 BHK is listed at ₹41.7K/sq.ft.; the 4 BHK is listed at ₹57.8K/sq.ft. Prices vary by configuration. The Goregaon West median is ₹33,778/sq ft across 59 other projects we list.
Prices are as listed by the developer and may change; ₹/sq.ft. is calculated on carpet area.
PropX8 Advisory
Property Insights
The numbers that matter, and what to check before you book.
- Price per sq.ft.
- ₹41.7K – ₹57.8K/sq.ft.
- Carpet area, by configuration
- Location
- Goregaon West
- Mumbai
- Possession
- Dec 2023
- Ready to Move
- Configuration
- 2–4 BHK
- 3 types
What to verify before booking
Exact inventory
Which units, floors and facings are actually available today
Floor-rise charges
Per-floor premiums added to the listed price
Parking charges
Whether a car park is included or sold separately
Other applicable charges
Maintenance deposit, society formation, legal and development charges
Current possession status
Whether the occupation certificate (OC) has been received
Amenities & Lifestyle
Location & Connectivity
Metro
Goregaon (West)
1.8 km
3 min drive*
Railway station
Ram Mandir
1.7 km
20 min walk
Airport
Mumbai Airport (Terminal 2)
11 km
13 min drive*
Highway
Western Express Highway
4.7 km
6 min drive*
Business district
Bandra Kurla Complex
16 km
16 min drive*
School
Vibgyor
1.1 km
14 min walk
Hospital
Siddarth Municipal Hospital
0.8 km
9 min walk
Road distances from the project's map location. *Drive times assume no traffic; peak-hour travel in Mumbai usually takes considerably longer. Walk times at 5 km/h. Data: © OpenStreetMap contributors, routing by OSRM.
Home Loan Offers
EASY HOME LOANS
Get exclusive interest rates starting from 8.35%* from our partner banks.











Frequently Asked Questions
What is the price of Kalpataru Radiance?
Prices at Kalpataru Radiance start at ₹ 5.50 Cr for a 3 BHK of 1,318 sq.ft. carpet. Starting prices by configuration: 3 BHK ₹ 5.50 Cr, 4 BHK ₹ 12.50 Cr. The 2 BHK is sold out.
What floor plans and configurations are available at Kalpataru Radiance?
Kalpataru Radiance in Goregaon West has these floor plans listed: 2 BHK from 906 sq.ft. carpet (sold out); 3 BHK from 1,318 sq.ft. carpet, starting at about ₹ 5.50 Cr; 4 BHK from 2,164 sq.ft. carpet, starting at about ₹ 12.50 Cr. Prices are the lowest listed price of each configuration; floor-rise, parking and other charges may be extra. The layouts are in the Floor Plans & Pricing section of this page.
What is the carpet area at Kalpataru Radiance?
Carpet areas range from 906–2,164 sq.ft.: 2 BHK 906 sq.ft., 3 BHK 1,318 sq.ft., 4 BHK 2,164 sq.ft.
When is possession of Kalpataru Radiance?
The listed possession date is Dec 2023 and the project is shown as Ready to Move. Confirm the occupation certificate (OC) status with the developer before booking.
What is the RERA number of Kalpataru Radiance?
Kalpataru Radiance is registered with MahaRERA under P51800000482. You can verify it on the MahaRERA website.
Kalpataru Radiance Goregaon West review: is it a good project?
PropX8 does not rate projects; this is the record of Kalpataru Radiance by Kalpataru on MahaRERA, Maharashtra's real estate regulator. According to the MahaRERA record PropX8 checked on 6 Nov 2026, the project is Completed on MahaRERA with a completion date of Dec 2024, and the builder has moved the completion date 2 years 6 months, from Jun 2022. Litigation is listed and 123 complaints (5 pending) are logged on the portal; a complaint is not by itself a finding against the builder. Across the 6 Kalpataru projects PropX8 has checked, 4 have kept the original completion date and 2 have moved it (extensions MahaRERA gave all projects not counted); PropX8 lists 20 Kalpataru projects in Mumbai.
Is there any litigation against Kalpataru Radiance?
Yes. MahaRERA lists litigation for Kalpataru Radiance (checked by PropX8 on 6 Nov 2026). Read the case details on the MahaRERA website before booking.
Does Kalpataru Radiance have an occupancy certificate (OC)?
MahaRERA did not show an occupancy certificate for Kalpataru Radiance when PropX8 checked on 6 Nov 2026. Ask the developer for the OC before taking possession.
Who is the developer of Kalpataru Radiance?
Kalpataru Radiance is developed by Kalpataru, which has 20 projects listed on PropX8 in Mumbai.
What is the estimated all-in cost at Kalpataru Radiance?
For the starting price of ₹ 5.50 Cr, the estimated all-in cost is about ₹ 5.50 Cr: a base property value of ₹ 5.19 Cr, stamp duty (6%) of ₹ 31.12 L and registration of ₹ 30,000. GST does not apply to a ready-to-move home. Floor-rise, parking and other charges may be extra, so ask the developer for the final cost sheet.
How much is the estimated EMI for Kalpataru Radiance?
On the starting price of ₹ 5.50 Cr, a 20% down payment (₹ 1.10 Cr) leaves a loan of ₹ 4.40 Cr. At 8.5% for 20 years, the EMI is about ₹ 3.82 L per month.
Where is Kalpataru Radiance located?
Kalpataru Radiance is in Near Swami Vivekananda Rd, Motilal Nagar I, Goregaon West, Mumbai. By road it is 1.8 km from Goregaon (West) metro, 1.7 km from Ram Mandir railway station, 4.7 km from Western Express Highway.
Is there any brokerage when buying Kalpataru Radiance through PropX8?
No. PropX8 charges buyers zero brokerage on Kalpataru Radiance.
Kalpataru Radiance
By Kalpataru
Starting Price
₹ 5.50 Cr onwards
More Projects in Goregaon West
All flats in Goregaon West
2, 3 BHKFc Happy Home Enclave
Goregaon West
₹ 1.83 Cr onwards
1, 2 BHKRishabraj Opulence
Goregaon West
₹ 1.35 Cr onwards
2, 3 BHKRaghav Utopia
Goregaon West
₹ 2.25 Cr onwards
2, 3 BHKSunteck Cloud 9
Goregaon West
₹ 3.92 Cr onwards
2, 3 BHKVipul Mitra Devtaa Pratham
Goregaon West
₹ 2.28 Cr onwards
1, 1.5, 2 BHKDharti Atria
Goregaon West
₹ 1.30 Cr onwards
More by Kalpataru
All Kalpataru projects
4 BHKKalpataru Prive
Mumbai Central
₹ 51.87 Cr onwards
3, 3.5 BHKKalpataru Elitus
Mulund
₹ 3.33 Cr onwards
2, 3, 3.5, 4.5 BHKKalpataru Vienta Commercial
Kandivali East
₹ 4.01 Cr onwards
2, 3, 3.5, 4.5 BHKKalpataru Vienta
Kandivali East
₹ 4.01 Cr onwards
4, 5 BHKKalpataru Azuro
Marine Lines
₹ 40.60 Cr onwards
1, 2, 3 BHKKalpataru Vivant
Jogeshwari East
₹ 1.55 Cr onwards